Potsdamer Neue Nationalgalerie refurbishment David Chipperfield Berlin Architecture
View from Potsdamer Straße © Simon Menges

Neue Nationalgalerie refurbishment

Architect: David Chipperfield Architects
Location: Berlin, Germany
Type: Museum
Year: 2021
Photographs: Simon Menges

The following description is courtesy of the architects. The Neue Nationalgalerie in Berlin is an icon of twentieth-century architecture. Planned and built from 1963 to 1968, the steel and glass structure is the only building designed by Ludwig Mies van der Rohe in Europe after his emigration to the USA.

After almost fifty years of intensive use, the listed building required a comprehensive refurbishment. The existing fabric has been refurbished and upgraded to current technical standards with a minimum of visual compromise to the building’s original appearance. The functional and technical upgrades include air-conditioning, artificial lighting, security, and visitors’ facilities, such as cloakroom, café and museum shop,
as well as improving disabled access and art handling.

Neue Nationalgalerie refurbishment David Chipperfield Berlin Architecture
View from Sigismundstraße © Simon Menges
Steel glass facade Neue Nationalgalerie refurbishment David Chipperfield Berlin Architecture
Steel and glass façade © Simon Menges

The necessity of an extensive repair of the reinforced concrete shell and the complete renewal of the technical building services required an in-depth intervention. In order to expose the shell construction, around 35,000 original building components, such as the stone cladding and all the interior fittings, were dismantled. After their restoration and modification where necessary, they were reinstalled in their precise
original positions.

The key to the complex planning process for this project was finding a suitable balance between monument conservation and the building’s use as a modern museum. The unavoidable interventions to the original fabric within this process had to be reconciled with preserving as much of the original substance as possible.

Though the essential additions remain subordinate to the existing design of the building, they are nevertheless discreetly legible as contemporary elements. The refurbishment project does not represent a new interpretation, but rather a respectful repair of this landmark building of the International Style.

Facade Detail Neue Nationalgalerie refurbishment David Chipperfield Berlin Architecture
Façade detail © Simon Menges
Steel Glass Facade Neue Nationalgalerie refurbishment David Chipperfield Berlin Architecture
Steel and glass façade © Simon Menges

Renovation of the steel and glass façade

After 50 years of use, the characteristic steel and glass façade of the Neue Nationalgalerie had reached a critical condition resulting from structural defects. The static underdimensioning of the glazing, corrosion around the glass retaining bars as well as the resulting broken glass had put public safety at risk. These problems were inevitable due to the design: Mies van der Rohe devoted more attention to the
appearance and proportions than to usability.

The non-thermally broken façade construction together with the relatively high humidity during exhibitions created a high level of condensation when outside temperatures dropped below 4°C. In order to minimise condensation, a detailed feasibility study at the beginning of the concept design stage analysed the use of double-pane insulated glazing. However, after assessing both the historic preservation and technical arguments, the decision was ultimately met to use mono-glazing in a non-thermally broken construction, as this was the most effective method of preserving the appearance of the upper exhibition hall.

In order to eliminate glass breakage in the future, laminated safety glass, which is twice as thick (2 x 12 mm), was used and the façade was adapted so that it can move without constraint. The method used to connect the roof to the façade was changed for this purpose: Short steel struts replace the continuous flat steel around the mullions. Newly planned expansion mullions on each side of the façade can absorb the movements in the construction. The construction was designed to be airtight and vapour-tight to prevent
corrosion inside the profile joints and cavities. The disadvantages of the non-thermally broken façade construction were accepted. Any condensate is collected in channels and drained in a controlled manner.

Despite the high demands, exceptional technical solutions made it possible to remedy the structural deficiencies in this unique façade in a manner that was gentle on the existing structure and ultimately hardly visible.

Detail Exhibition Hall Neue Nationalgalerie refurbishment David Chipperfield Berlin Architecture
Detail, exhibition hall © Simon Menges

Natural stone façade

The granite façade of the Neue Nationalgalerie in the area of the podium was one of the first ventilated natural stone façades installed in Germany. The façade was therefore considered to be an architectural monument due to its significance in construction history. The overarching objective was to restore the building’s appearance as far as possible, while reusing the historic granite slabs and ashlars.

All façade slabs were dismantled and repositioned in their exact original location during the necessary renovation of the façades, which included the renovation of the concrete shell, sealing and replacement of the thermal insulation. Before they were repositioned, the reusability of the natural stone slabs as curtain wall material had to be verified through various material tests. Broken slabs had to be replaced for structural reasons.

Undesirable details, such as movement joints that were cut vertically at a later stage, were eliminated. Static and thermal verification was also required to reconstruct the original anchors, which were standard flat anchors with a very narrow web thickness. As a result, the joint was restored to a width of 6 millimetres, in keeping with the joint used during the original construction.

Special attention was also paid to the cleaning of the façade slabs. Severe soiling and darkening of the surface, reddish-brown discolouration, biogenic growth and surface protection that had been improperly applied were delicately removed without harming the granite‘s substance. The gentle cleaning process homogenised the façades, but did not produce a radiant new appearance resembling the original. The tone of the slabs that had to be replaced was matched in order to homogenise them.

Neue Nationalgalerie refurbishment David Chipperfield Berlin Architecture
View from Landwehrkanal © Simon Menges
Sculpture garden Neue Nationalgalerie refurbishment David Chipperfield Berlin Architecture
Sculpture garden © Simon Menges

Restructuring and improvements in use

The programme, restructuring of the use and approach for updating the Neue Nationalgalerie to contemporary museum standards were developed jointly in an iterative process within the framework of the concept and developed design stages. The joint agreements were undertaken under the moderation and leadership of David Chipperfield Architects Berlin between the National Museums in Berlin as the user, the Prussian Cultural Heritage Foundation as the client, the German Federal Office for Building and Regional Planning as the client‘s construction representative, the Berlin Monument Authority as the responsible heritage authority, and the specialist consultants involved in the process. The coordination process was supported in an advisory capacity by Dirk Lohan, Mies van der Rohe’s grandson, who was involved in the original design process, and the architectural historian Prof. Dr. Fritz Neumeyer in his capacity as expert on Mies van der Rohe. Interventions and changes were limited to the absolute minimum. The condition of the building when it originally opened served as the primary reference.

The restructuring of the functions helps restore the building to its original spatial structure. In the lower level, the ideal floorplan for the public areas at the time of construction was restored by relocating the cloakroom and the bookshop to the previous painting and sculpture storage areas. The museum café was kept in its original place. The original vending machine wall in the café was restored but reinterpreted as a
reminder of the 1960s. The visitor toilets from the original construction period were left in place and only modified in certain areas. The relocated storage areas are now situated in a new underground area below the podium terrace. By repurposing and converting former technical spaces, it was possible to set up a contemporary exhibition preparation area as well as additional storage rooms. The technical building services are now also installed in the new underground construction.

For the first time since its opening, the Neue Nationalgalerie now offers barrier-free access. A new ramp is located at the southeast staircase of the podium, providing access to both the large terrace and the main entrance. In the future, the exhibition rooms and access to the service facilities will be connected by doors, which will be kept open to extend the space without any thresholds.

Exhibition Hall Neue Nationalgalerie refurbishment David Chipperfield Berlin Architecture
Exhibition hall © Simon Menges
Exhibition Hall Neue Nationalgalerie refurbishment David Chipperfield Berlin Architecture
Exhibition hall © Simon Menges
Exhibition Hall Neue Nationalgalerie refurbishment David Chipperfield Berlin Architecture
Exhibition hall © Simon Menges
Facade detail Neue Nationalgalerie refurbishment David Chipperfield Berlin Architecture
Façade detail © Simon Menges

Interior fittings and building services

The original modular ceiling in the basement was upgraded in terms of fire protection and operability while retaining its appearance. A flexible ceiling system with metal cassettes replaces the original wooden substructure. New wooden modular panels were mounted on top. In order to avoid the need to attach additional busbars, they were integrated flush into the ceiling parallel to the exhibition walls.

In keeping with its historical appearance, the upper exhibition hall was once again fitted with a curtain. The selection of the material was based on the original curtain. The motors and rope guides that had been preserved were repaired. In the exhibition area on the lower ground floor, the curtain and glare protection were selected according to lighting and conservation requirements. Since the original carpet was no longer
preserved here, a replica was made based on a presumed original pattern, historical photos and reports.

The technical building services were upgraded to meet the technical requirements of a contemporary museum building. The challenge was to preserve the visible original elements of the building’s technical equipment from a material and functional perspective and to integrate new technology into the overall design of the listed building. The new ventilation equipment for the air curtain system of the glass façades uses the supply air grating dating back to the time of the original construction. The impression of the washrooms as they were when they were first built was recaptured by reconstructing the washstands and reversing the wall-mounted installation. The original fittings with visible switches, pushbuttons and sockets were reconstructed.

The underfloor heating beneath the stone flooring of the upper hall was completely restored and also equipped with an underfloor cooling system. The system had been taken out of service at an early stage, because its steel pipes had become corroded and started leaking. Due to the high storage mass of the floor, the restoration of the underfloor heating made an essential contribution to stablising the indoor climate. The radiators that were installed at a later stage in adjacent rooms could also be removed,
bringing the building back closer to its original design by Ludwig Mies van der Rohe.

Staircase Hall Neue Nationalgalerie refurbishment David Chipperfield Berlin Architecture
Staircase hall, lower ground floor © Simon Menges
Neue Nationalgalerie refurbishment David Chipperfield Berlin Architecture Museum Shop
Museum shop, lower ground floor © Simon Menges
Cloakroom Neue Nationalgalerie refurbishment David Chipperfield Berlin Architecture
Cloakroom, lower ground floor © Simon Menges

Sustainability

The refurbishment will grant the Neue Nationalgalerie a second lease on life. The hazardous materials used during the construction of the building in the 1960s, including asbestos and artificial mineral fibre, were completely removed, paving the way to continue operating the building in a healthy and sustainable manner.

The building was modified to reduce energy consumption wherever such measures aligned with heritage conservation issues. The structural thermal insulation of the exhibition hall roof and the upper end of the lower ground floor, for example, was significantly improved. A highly efficient run-around coil system was installed during renovation of the ventilation system. Particularly in summer, it assists the air conditioning system to achieve the building’s required cooling capacity.

The existing light fixtures were converted to LED technology suitable for museum use. The LED technology not only enables a significantly higher lighting level, but also achieves considerable energy savings compared to the historical system, while maintaining the light distribution of the original building.

Exhibition Hall Neue Nationalgalerie refurbishment David Chipperfield Berlin Architecture Night
Exhibition hall, night time © Simon Menges
Exhibition Hall Neue Nationalgalerie refurbishment David Chipperfield Berlin Architecture Night
Exhibition hall, night time © Simon Menges
Exhibition Hall Neue Nationalgalerie refurbishment David Chipperfield Berlin Architecture Night
Exhibition hall, night time © Simon Menges

Project Details

  • Project Timeline:
    • Tender procedure: 2012
    • Project start: 2012
    • Construction start: 2016
    • Completion: 2021
    • Opening: 2021
  • Gross floor area: 13,900 m2
  • Client: Stiftung Preußischer Kulturbesitz represented by the Bundesamt für Bauwesen und Raumordnung
    • Project management: Arne Maibohm
  • Project controlling: KVL Bauconsult GmbH, Berlin
  • User: Nationalgalerie – Staatliche Museen zu Berlin
  • Architect: David Chipperfield Architects Berlin
  • Partners: David Chipperfield, Martin Reichert, Alexander Schwarz
  • Project architects: Daniel Wendler and Michael Freytag (Concept design to Technical design, Site design supervision)
  • Project team:
    • Concept design to Developed design: Marianne Akay, Thomas Benk, Matthias Fiegl, Anke Fritzsch, Dirk Gschwind, Anne Hengst, Franziska Michalsky, Maxi Reschke
    • Technical design: Sebastian Barrett, Alexander Bellmann, Martina Betzold, Anke Fritzsch, Dirk Gschwind, Lukas Graf, Martijn Jaspers, Christopher Jonas, Franziska Michalsky, Maxi Reschke, Christian Vornholt, Lukas Wichmann.
    • Visualisation: Dalia Liksaite, Simon Wiesmaier
    • Fit-out: Yannic Calvez, Ute Zscharnt

Collaborators

  • Executive architect: BAL Bauplanungs und Steuerungs GmbH, Berlin (Procurement, construction supervision)
    • Project management: Kerstin Rohrbach
  • Restoration consultant: Pro Denkmal GmbH, Berlin
  • Structural engineer: GSE Ingenieurgesellschaft mbH Saar, Enseleit und Partner, Berlin
  • Services engineer: Ingenieurgesellschaft W33 mbH with Domann Beratende Ingenieure GmbH, Berlin
  • Building physics: Müller-BBM GmbH, Berlin
  • Acoustic consultant: Akustik-Ingenieurbüro Moll GmbH, Berlin
  • Fire Consultant: HHP West Beratende Ingenieure GmbH, Bielefeld
  • Façade consultant: DS-Plan, Stuttgart
  • Lighting consultant: Arup Deutschland GmbH, Berlin
  • Landscape architect: TOPOS Stadtplanung Landschaftsplanung Stadtforschung, Berlin
Show CommentsClose Comments

Leave a comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.